ITAC Assessment: WI0398
ITAC logo
ITAC Assessment: WI0398
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Frozen Bakery
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 389
Plant Area 150,000
ft2
Annual Production 75,000,000
lb
Production Hrs. Annual 6,150
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $487,301 18,780,768
kWh
Electricity Demand $340,377 37,701
kW-mo/yr
Electricity Fees $48,581 -
Natural Gas $212,344 40,468
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $376,991 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 4.441: Install automatic packing equipment $129,888 $20,000 - - - $129,888
02 2.2621: Modify refrigeration system to operate at a lower pressure $120,634 $360,000 $80,536
2,960,874
kWh
$40,098
-
kW-mo/yr
- -
03 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $116,146 $630,000 $89,910
2,700,000
kWh
$102,384
-
kW-mo/yr
$(-69,848.0)
-
MMBtu
$(-6,300.0)
04 2.3132: Recharge batteries on during off-peak demand periods $8,467 $18,150 - $8,467
-
kW-mo/yr
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,260 $500 - - $1,260
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $596 - $395
14,514
kWh
$201
-
kW-mo/yr
- -
TOTAL RECOMMENDED $376,991 $1,028,650 $170,841
5,675,388
kWh
$151,150
-
kW-mo/yr
$(-68,588.0)
-
MMBtu
$123,588
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs