Assessment Year | 2001 |
---|---|
Principal Product | Food Service Equipment |
NAICS |
n/a
|
SIC | 3589: Service Industry Machinery, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 290 |
Plant Area |
212,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 6,075
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $111,586 | 3,624,471 |
kWh
|
$0.031 |
Electricity Demand | $55,405 | 10,407 |
kW-mo/yr
|
$5.32 |
Electricity Fees | $18,972 | - |
|
- |
Natural Gas | $45,257 | 8,962 |
MMBtu
|
$5.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,394 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,138 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $8,173 | - | - | - | - | - |
$8,173
-
lb
|
- | - | |
02 | 3.8142: Distill contaminated solvents for reuse | $3,674 | $7,700 | - | - | - |
$4,756
-
gal
|
$(-288.0)
-
lb
|
$(-481.0) | $(-313.0) | |
03 | 3.3131: Use evaporation to concentrate material | $3,585 | $10,000 | - | - |
$(-104.0)
-
MMBtu
|
$4,289
-
gal
|
- | $(-600.0) | - | |
04 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $2,972 | $6,675 |
$2,972
92,022
kWh
|
- | - | - | - | - | - | |
05 | 2.7135: Install occupancy sensors | $1,025 | $2,400 |
$427
13,222
kWh
|
$598
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.6218: Turn off equipment when not in use | $813 | - |
$813
25,178
kWh
|
- | - | - | - | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $650 | $640 |
$523
16,186
kWh
|
$127
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.3134: Shift from daytime to nighttime operation | $502 | - | - |
$502
-
kW-mo/yr
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $21,394 | $27,415 |
$4,735
146,608
kWh
|
$1,227
-
kW-mo/yr
|
$(-104.0)
-
MMBtu
|
$9,045
-
gal
|
$7,885
-
lb
|
$(-1,081.0) | $(-313.0) | ||
TOTAL IMPLEMENTED | $10,138 | $640 |
$1,336
41,364
kWh
|
$629
-
kW-mo/yr
|
- | - |
$8,173
-
lb
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |