Assessment Year | 1999 |
---|---|
Principal Product | Commercial Printed Products |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
40,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $53,933 | 1,465,416 |
kWh
|
$0.037 |
Electricity Demand | $69,776 | 5,628 |
kW-mo/yr
|
$12.40 |
Electricity Fees | $16,693 | - |
|
- |
Natural Gas | $15,685 | 3,415 |
MMBtu
|
$4.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,770 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,454 | $1,484 | n/a |
$2,092
53,634
kWh
|
$1,362
-
kW-mo/yr
|
- | - |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,359 | $7,200 | n/a |
$2,359
60,668
kWh
|
- | - | - |
03 | 4.445: Install equipment to move product | $1,875 | $6,350 | n/a | - | - | - | $1,875 |
04 | 3.6192: Use a less expensive method of waste removal | $1,752 | - | n/a | - | - |
$1,752
-
lb
|
- |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $689 | $1,807 | n/a |
$304
7,913
kWh
|
$385
-
kW-mo/yr
|
- | - |
06 | 2.4221: Install compressor air intakes in coolest locations | $641 | $640 | n/a |
$384
9,965
kWh
|
$257
-
kW-mo/yr
|
- | - |
TOTAL RECOMMENDED | $10,770 | $17,481 |
$5,139
132,180
kWh
|
$2,004
-
kW-mo/yr
|
$1,752
-
lb
|
$1,875 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs