Assessment Year | 1998 |
---|---|
Principal Product | Carrying cases, coolers, and cushions |
NAICS |
n/a
|
SIC | 3161: Luggage |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
189,300
ft2
|
Annual Production | 85,000
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $41,075 | 1,120,457 |
kWh
|
$0.037 |
Electricity Demand | $51,679 | 4,469 |
kW-mo/yr
|
$11.56 |
Electricity Fees | $1,117 | - |
|
- |
Natural Gas | $30,412 | 8,619 |
MMBtu
|
$3.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $184,011 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $160,260 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.521: Clear and rent existing space | $159,400 | $5,292 | - | - | - | $159,400 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,855 | $23,584 |
$5,075
138,042
kWh
|
$6,780
-
kW-mo/yr
|
- | - | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $5,313 | - |
$(-178.0)
(-4,689)
kWh
|
- |
$5,491
-
MMBtu
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,118 | $15,500 |
$4,118
111,958
kWh
|
- | - | - | |
05 | 2.3132: Recharge batteries on during off-peak demand periods | $1,197 | $200 | - |
$1,197
-
kW-mo/yr
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $860 | $500 | - | - |
$860
-
MMBtu
|
- | |
07 | 2.7241: Install outside air damper / economizer on hvac unit | $680 | $2,100 |
$680
18,464
kWh
|
- | - | - | |
08 | 3.7137: Replace cloth rags with paper towels | $588 | - | - | - | - | $588 | |
TOTAL RECOMMENDED | $184,011 | $47,176 |
$9,695
263,775
kWh
|
$7,977
-
kW-mo/yr
|
$6,351
-
MMBtu
|
$159,988 | ||
TOTAL IMPLEMENTED | $160,260 | $5,792 | - | - |
$860
-
MMBtu
|
$159,400 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs