| Assessment Year | 1998 |
|---|---|
| Principal Product | Propane Gas Tanks & Satellite Dish Antennas |
| NAICS |
n/a
|
| SIC | 3444: Sheet Metal Work |
| Sales Range | $10 M to 50M |
| # of Employees | 260 |
| Plant Area |
285,880
ft2
|
| Annual Production | 9,300,000
pieces
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $235,312 | 10,347,304 |
kWh
|
$0.023 |
| Electricity Demand | $153,810 | 20,883 |
kW-mo/yr
|
$7.37 |
| Electricity Fees | $5,700 | - |
|
- |
| Natural Gas | $92,594 | 55,474 |
MMBtu
|
$1.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $83,553 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $214 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.126: Install sensors to detect defects | $69,212 | $63,760 |
$(-276.0)
(-11,430)
kWh
|
$(-112.0)
-
kW-mo/yr
|
- | - | - | $69,600 | - | |
| 02 | 3.8142: Distill contaminated solvents for reuse | $6,046 | $13,200 | - | - | - |
$8,473
-
gal
|
$(-412.0)
-
lb
|
$(-1,020.0) | $(-995.0) | |
| 03 | 2.7243: Improve air circulation with destratification fans / other methods | $4,599 | $18,400 |
$(-1,016.0)
(-42,497)
kWh
|
- |
$5,615
-
MMBtu
|
- | - | - | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $2,295 | $940 |
$1,659
69,461
kWh
|
$636
-
kW-mo/yr
|
- | - | - | - | - | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,187 | $500 | - | - |
$1,187
-
MMBtu
|
- | - | - | - | |
| 06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $214 | - | - | - | - | - |
$214
-
lb
|
- | - | |
| TOTAL RECOMMENDED | $83,553 | $96,800 |
$367
15,534
kWh
|
$524
-
kW-mo/yr
|
$6,802
-
MMBtu
|
$8,473
-
gal
|
$(-198.0)
-
lb
|
$68,580 | $(-995.0) | ||
| TOTAL IMPLEMENTED | $214 | - | - | - | - | - |
$214
-
lb
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs