ITAC Assessment: WI0316
ITAC logo
ITAC Assessment: WI0316
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Fractional motors and motion controls
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area 368,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $399,546 10,927,316
kWh
Electricity Demand $292,332 20,569
kW-mo/yr
Electricity Fees $36,641 -
Natural Gas $205,111 59,839
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,328 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,566

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 4.452: Eliminate shift $36,000 $40,000 - - - - - - $36,000 - -
02 2.2621: Modify refrigeration system to operate at a lower pressure $15,330 $46,000 $4,776
123,681
kWh
$10,554
-
kW-mo/yr
- - - - - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,476 $30,250 $13,476
349,062
kWh
- - - - - - - -
04 3.7137: Replace cloth rags with paper towels $6,566 - - - - - - $(-834.0)
-
lb
- $7,400 -
05 3.3131: Use evaporation to concentrate material $3,025 $10,000 - - $(-50.0)
-
MMBtu
- $3,450
-
gal
- $(-375.0) - -
06 3.4113: Treat and reuse rinse waters $931 $1,475 - - - $1,231
-
Tgal
- - - - $(-300.0)
TOTAL RECOMMENDED $75,328 $127,725 $18,252
472,743
kWh
$10,554
-
kW-mo/yr
$(-50.0)
-
MMBtu
$1,231
-
Tgal
$3,450
-
gal
$(-834.0)
-
lb
$35,625 $7,400 $(-300.0)
TOTAL IMPLEMENTED $6,566 - - - - - - $(-834.0)
-
lb
- $7,400 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs