ITAC Assessment: WI0308
ITAC logo
ITAC Assessment: WI0308
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Farm Machinery
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 142,250
ft2
Annual Production 2,000
pieces
Production Hrs. Annual 2,875
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,600 808,324
kWh
Electricity Demand $19,983 2,290
kW-mo/yr
Electricity Fees $755 -
Natural Gas $44,223 8,626
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,051 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,530

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $36,638 $2,500 - - - $4,668
-
lb
- - $31,970
02 2.8113: Purchase gas directly from a contract gas supplier $11,074 $500 - - - - - $11,074 -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $11,031 $8,700 - - - $11,031
-
lb
- - -
04 3.6192: Use a less expensive method of waste removal $10,950 - - - - - - $10,950 -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,700 - - - $1,700
-
lb
- - - -
06 3.8122: Use tight-fitting lids on material containers to reduce voc emissions $3,726 $1,000 - - - - $3,375 - $351
07 2.8121: Apply for tax-free status for energy purchases $1,716 - - - - - - $1,716 -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $216 $90 $129
2,931
kWh
$87
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $77,051 $12,790 $129
2,931
kWh
$87
-
kW-mo/yr
$1,700
-
lb
$15,699
-
lb
$3,375 $23,740 $32,321
TOTAL IMPLEMENTED $51,530 $3,590 $129
2,931
kWh
$87
-
kW-mo/yr
- $4,668
-
lb
$3,375 $10,950 $32,321
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs