ITAC Assessment: WI0295
ITAC logo
ITAC Assessment: WI0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Zinc and Aluminum Die Casting
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $5
M
to 10
M
# of Employees 72
Plant Area 66,500
ft2
Annual Production 1,248,000
lb
Production Hrs. Annual 4,250
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,254 2,218,347
kWh
Electricity Demand $49,608 5,752
kW-mo/yr
Electricity Fees $7,619 -
Natural Gas $212,104 58,051
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $212,238 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings
01 4.321: Optimize production lot sizes and inventories $119,785 - n/a - - - - - - $119,785 -
02 4.653: Maintain/enlarge a stock of spare parts $68,700 - n/a - - - - - $(-7,800.0) - $76,500
03 2.8121: Apply for tax-free status for energy purchases $14,566 - n/a - - - - - $14,566 - -
04 3.7137: Replace cloth rags with paper towels $6,488 $10,000 n/a - - $(-512.0)
-
MMBtu
$9,000
-
gal
$(-2,000.0) - - -
05 2.7447: Install vinyl strip / high speed / air curtain doors $822 $1,010 n/a - - $822
-
MMBtu
- - - - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $807 $500 n/a - - $807
-
MMBtu
- - - - -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $617 - n/a - $917
-
kW-mo/yr
- - $(-300.0) - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $453 - n/a $278
9,672
kWh
$175
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $212,238 $11,510 $278
9,672
kWh
$1,092
-
kW-mo/yr
$1,117
-
MMBtu
$9,000
-
gal
$(-2,300.0) $6,766 $119,785 $76,500
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs