| Assessment Year | 1994 |
|---|---|
| Principal Product | Machined components for use in diesel engine, hydraulic, and |
| NAICS |
n/a
|
| SIC | 3451: Screw Machine Products |
| Sales Range | $10 M to 50M |
| # of Employees | 230 |
| Plant Area |
101,750
ft2
|
| Annual Production | 8,500,000
lb
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $121,187 | 2,295,428 |
kWh
|
$0.053 |
| Natural Gas | $14,186 | 2,756 |
MMBtu
|
$5.15 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $45,916 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,646 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $10,556 | $6,000 | - |
$10,556
-
MMBtu
|
- | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $4,229 | $3,840 |
$4,229
80,012
kWh
|
- | - | - | |
| 03 | 2.7221: Lower temperature during the winter season and vice-versa | $1,970 | $600 | - |
$1,970
-
MMBtu
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,382 | $8,346 |
$3,382
64,185
kWh
|
- | - | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $325 | - |
$325
6,155
kWh
|
- | - | - | |
| 06 | 2.4133: Use most efficient type of electric motors | $186 | $528 |
$186
3,517
kWh
|
- | - | - | |
| 07 | 2.2514: Cover open tanks | $1,852 | $288 |
$1,852
35,170
kWh
|
- | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $708 | $820 |
$708
13,482
kWh
|
- | - | - | |
| 09 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $408 | - |
$408
-
kWh
|
- | - | - | |
| 10 | 3.8143: Recycle cleaning solvent and reuse | $15,300 | $21,000 | - | - |
$15,300
-
gal
|
- | |
| 11 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $7,000 | $10,000 | - | - | - |
$7,000
-
lb
|
|
| TOTAL RECOMMENDED | $45,916 | $51,422 |
$11,090
202,521
kWh
|
$12,526
-
MMBtu
|
$15,300
-
gal
|
$7,000
-
lb
|
||
| TOTAL IMPLEMENTED | $14,646 | $15,166 |
$4,090
77,667
kWh
|
$10,556
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs