ITAC Assessment: WI0199
ITAC logo
ITAC Assessment: WI0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Laser m/c and marking of glass
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 30,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,706 1,483,587
kWh
Natural Gas $4,634 818
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,087 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,610

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,320 $1,800 $11,320
157,386
kWh
-
02 2.7135: Install occupancy sensors $1,834 $825 $1,834
25,498
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $817 $1,276 $817
17,292
kWh
-
04 2.2614: Use cooling tower or economizer to replace chiller cooling $3,819 $15,000 $3,819
-
kWh
-
05 2.2437: Recover waste heat from equipment $1,504 $600 - $1,504
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $725 $640 $725
9,965
kWh
-
07 2.7224: Reduce space conditioning during non-working hours $726 $1,000 - $726
-
MMBtu
08 2.2511: Insulate bare equipment $342 $77 $342
4,689
kWh
-
TOTAL RECOMMENDED $21,087 $21,218 $18,857
214,830
kWh
$2,230
-
MMBtu
TOTAL IMPLEMENTED $2,610 $2,993 $1,884
31,946
kWh
$726
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs