| Assessment Year | 1994 |
|---|---|
| Principal Product | Laser m/c and marking of glass |
| NAICS |
n/a
|
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 85 |
| Plant Area |
30,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $106,706 | 1,483,587 |
kWh
|
$0.072 |
| Natural Gas | $4,634 | 818 |
MMBtu
|
$5.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $21,087 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,610 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,320 | $1,800 |
$11,320
157,386
kWh
|
- | |
| 02 | 2.7135: Install occupancy sensors | $1,834 | $825 |
$1,834
25,498
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $817 | $1,276 |
$817
17,292
kWh
|
- | |
| 04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $3,819 | $15,000 |
$3,819
-
kWh
|
- | |
| 05 | 2.2437: Recover waste heat from equipment | $1,504 | $600 | - |
$1,504
-
MMBtu
|
|
| 06 | 2.4221: Install compressor air intakes in coolest locations | $725 | $640 |
$725
9,965
kWh
|
- | |
| 07 | 2.7224: Reduce space conditioning during non-working hours | $726 | $1,000 | - |
$726
-
MMBtu
|
|
| 08 | 2.2511: Insulate bare equipment | $342 | $77 |
$342
4,689
kWh
|
- | |
| TOTAL RECOMMENDED | $21,087 | $21,218 |
$18,857
214,830
kWh
|
$2,230
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $2,610 | $2,993 |
$1,884
31,946
kWh
|
$726
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs