ITAC Assessment: WI0166
ITAC logo
ITAC Assessment: WI0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Bleach, anti Freeze, Bottles
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 20,000
ft2
Annual Production 13,000
Tgal
Production Hrs. Annual 2,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,791 1,810,961
kWh
Natural Gas $26,237 13,794
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,907 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,611

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3133: Consider three or four days around-the-clock operation rather than one or two shifts per day $1,244 - $1,244
-
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,344 $1,560 $1,344
19,050
kWh
03 2.6218: Turn off equipment when not in use $1,023 - $1,023
14,654
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $773 $1,068 $773
10,844
kWh
05 2.2511: Insulate bare equipment $523 $48 $523
7,327
kWh
TOTAL RECOMMENDED $4,907 $2,676 $4,907
51,875
kWh
TOTAL IMPLEMENTED $3,611 $1,560 $3,611
33,704
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs