ITAC Assessment: WI0115
ITAC logo
ITAC Assessment: WI0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ICE CREAM CONES
NAICS
n/a
SIC 2052: Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 360,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,108 1,265,533
kWh
Natural Gas $138,387 38,594
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,148 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,148

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $15,437 - $3,432
-
kWh
$12,005
-
MMBtu
02 2.2437: Recover waste heat from equipment $2,500 $10,000 - $2,500
-
MMBtu
03 2.2511: Insulate bare equipment $261 $188 - $261
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $587 $240 $587
12,309
kWh
-
05 2.7226: Use computer programs to optimize hvac performance $313 $2,100 $313
6,741
kWh
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $370 $1,400 $546
11,430
kWh
$(-176.0)
-
MMBtu
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $200 - $200
4,103
kWh
-
08 2.6232: Install set-back timers $186 $200 $186
3,810
kWh
-
09 2.7221: Lower temperature during the winter season and vice-versa $160 $200 - $160
-
MMBtu
10 2.6214: Shut off pilots in standby equipment $134 - - $134
-
MMBtu
TOTAL RECOMMENDED $20,148 $14,328 $5,264
38,393
kWh
$14,884
-
MMBtu
TOTAL IMPLEMENTED $20,148 $14,328 $5,264
38,393
kWh
$14,884
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs