| Assessment Year | 1989 |
|---|---|
| Principal Product | DOORS |
| NAICS |
n/a
|
| SIC | 2431: Millwork |
| Sales Range | $5 M to 10M |
| # of Employees | 75 |
| Plant Area |
n/a
|
| Annual Production | 185,000
pieces
|
| Production Hrs. Annual | 2,125
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $53,900 | 681,712 |
kWh
|
$0.079 |
| Natural Gas | $40,095 | 7,313 |
MMBtu
|
$5.48 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $34,893 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,190 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8121: Apply for tax-free status for energy purchases | $14,033 | - | - |
$14,033
-
MMBtu
|
- | |
| 02 | 2.7261: Install timers and/or thermostats | $8,220 | $1,750 | - |
$8,220
-
MMBtu
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,593 | $21,311 |
$7,593
96,131
kWh
|
- | - | |
| 04 | 2.4312: Improve lubrication practices | $2,088 | - |
$2,088
26,377
kWh
|
- | - | |
| 05 | 2.1123: Install automatic stack damper | $1,970 | $1,400 | - |
$1,970
-
MMBtu
|
- | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $507 | $500 | - |
$557
-
MMBtu
|
$(-50.0) | |
| 07 | 2.6121: Reduce hot water temperature to the minimum required | $271 | - |
$271
3,517
kWh
|
- | - | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $211 | - |
$211
2,638
kWh
|
- | - | |
| TOTAL RECOMMENDED | $34,893 | $24,961 |
$10,163
128,663
kWh
|
$24,780
-
MMBtu
|
$(-50.0) | ||
| TOTAL IMPLEMENTED | $10,190 | $3,150 | - |
$10,190
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs