ITAC Assessment: WI0045
ITAC logo
ITAC Assessment: WI0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product SNOWPLOWS
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 20,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,183 1,952,814
kWh
Natural Gas $64,834 13,228
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,620

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4312: Improve lubrication practices $3,520 - $3,520
50,410
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $842 - $842
12,016
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $114 $89 $114
1,758
kWh
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,605 $2,500 $2,291
32,825
kWh
$(-686.0)
-
MMBtu
05 2.3191: Use demand controller or load shedder $3,144 $5,000 $3,144
-
kWh
-
TOTAL RECOMMENDED $9,225 $7,589 $9,911
97,009
kWh
$(-686.0)
-
MMBtu
TOTAL IMPLEMENTED $7,620 $5,089 $7,620
64,184
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs