ITAC Assessment: WI0016
ITAC logo
ITAC Assessment: WI0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product BALL POINT PENS, PENCILS
NAICS
n/a
SIC 3951: Pens, Mechanical Pencils, and Parts
Sales Range $5
M
to 10
M
# of Employees 122
Plant Area
n/a
Annual Production 42,000,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,966 864,009
kWh
Natural Gas $14,449 2,732
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,228 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,071

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4312: Improve lubrication practices $312 - $312
3,517
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $157 - $157
1,758
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,030 $3,314 $4,030
45,721
kWh
-
04 2.3191: Use demand controller or load shedder $2,571 $5,000 $2,571
-
kWh
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,158 $1,200 $1,558
17,585
kWh
$(-400.0)
-
MMBtu
TOTAL RECOMMENDED $8,228 $9,514 $8,628
68,581
kWh
$(-400.0)
-
MMBtu
TOTAL IMPLEMENTED $8,071 $9,514 $8,471
66,823
kWh
$(-400.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs