ITAC Assessment: UW2602
ITAC logo
ITAC Assessment: UW2602
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Softwood Veneer & Rainier Fiber
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 86
Plant Area 171,000
ft2
Annual Production 18,000
ton
Production Hrs. Annual 4,368
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $600,793 10,356,000
kWh
Electricity Demand $253,028 25,340
kW-mo/yr
Electricity Fees $47,263 -
Natural Gas $127,242 42,908
MMBtu
Other Gas $18,387 1
MMBtu
TOTAL YEARLY COSTS $1,046,713
RECOMMENDED SAVINGS* $500,346 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 3.6123: Burn wood by-products for heat $362,644 $6,038,074 $241,280
4,160,000
kWh
$76,687
-
kW-mo/yr
$44,677
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,269 $7,520 $4,256
73,383
kWh
$2,013
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $20,293 $15,688 $20,293
349,877
kWh
- - -
04 2.4322: Use or replace with energy efficient substitutes $10,764 $32,940 $8,559
147,560
kWh
$2,205
-
kW-mo/yr
- -
05 2.2135: Repair and eliminate steam leaks $38,800 $7,287 - - $38,800
-
MMBtu
-
06 2.3212: Optimize plant power factor $61,576 $37,084 - - - $61,576
TOTAL RECOMMENDED $500,346 $6,138,593 $274,388
4,730,820
kWh
$80,905
-
kW-mo/yr
$83,477
-
MMBtu
$61,576
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs