Assessment Year | 2021 |
---|---|
Principal Product | Automobile safety equipment |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $100 M to 500M |
# of Employees | 600 |
Plant Area |
275,000
ft2
|
Annual Production | 32,000,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $928,018 | 20,531,362 |
kWh
|
$0.045 | |
Electricity Demand | $332,393 | 38,831 |
kW-mo/yr
|
$8.56 | |
Electricity Fees | $84,333 | - |
|
- | |
Natural Gas | $16,391 | 3,903 |
MMBtu
|
$4.20 | |
Waste Disposal Costs | |||||
Water Usage | $11,295 | 8,305 |
Tgal
|
$1.36 | |
TOTAL YEARLY COSTS | $1,372,429 | ||||
RECOMMENDED SAVINGS* | $332,725 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $140,677 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $156,566 | $187,200 |
$125,429
2,774,973
kWh
|
$31,137
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $94,747 | $42,608 |
$75,230
1,664,400
kWh
|
$19,517
-
kW-mo/yr
|
- | |
03 | 2.7132: Install timers on light switches in little used areas | $29,753 | $10,400 |
$29,753
658,226
kWh
|
- | - | |
04 | 2.3212: Optimize plant power factor | $23,470 | $21,270 | - | - | $23,470 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,766 | $7,600 |
$10,136
224,256
kWh
|
$2,630
-
kW-mo/yr
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,012 | $22,700 |
$12,012
265,747
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,411 | $5,700 |
$3,411
75,461
kWh
|
- | - | |
TOTAL RECOMMENDED | $332,725 | $297,478 |
$255,971
5,663,063
kWh
|
$53,284
-
kW-mo/yr
|
$23,470 | ||
TOTAL IMPLEMENTED | $140,677 | $66,308 |
$118,530
2,622,343
kWh
|
$22,147
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs