ITAC Assessment: UU0176
ITAC logo
ITAC Assessment: UU0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Automobile safety equipment
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 275,000
ft2
Annual Production 32,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $928,018 20,531,362
kWh
Electricity Demand $332,393 38,831
kW-mo/yr
Electricity Fees $84,333 -
Natural Gas $16,391 3,903
MMBtu
Waste Disposal Costs
Water Usage $11,295 8,305
Tgal
TOTAL YEARLY COSTS $1,372,429
RECOMMENDED SAVINGS* $332,725 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $140,677

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4239: Eliminate or reduce compressed air usage $156,566 $187,200 $125,429
2,774,973
kWh
$31,137
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $94,747 $42,608 $75,230
1,664,400
kWh
$19,517
-
kW-mo/yr
-
03 2.7132: Install timers on light switches in little used areas $29,753 $10,400 $29,753
658,226
kWh
- -
04 2.3212: Optimize plant power factor $23,470 $21,270 - - $23,470
05 2.7142: Utilize higher efficiency lamps and/or ballasts $12,766 $7,600 $10,136
224,256
kWh
$2,630
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,012 $22,700 $12,012
265,747
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,411 $5,700 $3,411
75,461
kWh
- -
TOTAL RECOMMENDED $332,725 $297,478 $255,971
5,663,063
kWh
$53,284
-
kW-mo/yr
$23,470
TOTAL IMPLEMENTED $140,677 $66,308 $118,530
2,622,343
kWh
$22,147
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs