Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Concrete blocks, Stone masonry
NAICS 212321: Construction Sand and Gravel Mining
SIC 3271: Concrete Block and Brick
Sales Range $10
M
to 50
M
# of Employees 4
Plant Area 19,000
ft2
Annual Production 800,000
units
Production Hrs. Annual 1,890
hrs
Location (State) Alaska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $7,664 226,480
kWh
Electricity Demand $51,780 1,561
kW-mo/yr
Electricity Fees $20,232 -
Natural Gas $31,003 3,307
MMBtu
Other Gas $9,370 1
MMBtu
TOTAL YEARLY COSTS $120,049
RECOMMENDED SAVINGS* $86,218 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $1,400 $1,080 $1,400
-
MMBtu
02 2.7491: Insulate glazing, walls, ceilings, and roofs $80,006 $297,653 $80,006
-
MMBtu
03 2.2135: Repair and eliminate steam leaks $4,812 $3,250 $4,812
-
MMBtu
TOTAL RECOMMENDED $86,218 $301,983 $86,218
-
MMBtu
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs