ITAC Assessment: UW2502
ITAC logo
ITAC Assessment: UW2502
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Water and Sewer Utility Service
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 134,000
ft2
Annual Production 1,500,000
Tgal
Production Hrs. Annual 2,470
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,853 278,021
kWh
Electricity Demand $1,128 1,281
kW-mo/yr
Electricity Fees $1,605 -
Natural Gas $13,747 1,014
MMBtu
TOTAL YEARLY COSTS $41,333
RECOMMENDED SAVINGS* $21,274 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7492: Use proper thickness of insulation on building envelope $2,373 $13,260 - - $2,373
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $332 $2,872 $332
3,728
kWh
$0
-
kW-mo/yr
-
03 2.8226: Increase efficiency of trucks $10,938 $114,250 $10,938
122,353
kWh
- -
04 2.9114: Use solar heat to make electricty $5,248 $31,835 $5,248
58,713
kWh
- -
05 2.7313: Recycle air for heating, ventilation and air conditioning $2,383 $20,158 $2,359
26,385
kWh
$24
-
kW-mo/yr
-
TOTAL RECOMMENDED $21,274 $182,375 $18,877
211,179
kWh
$24
-
kW-mo/yr
$2,373
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs