ITAC Assessment: UW2213
ITAC logo
ITAC Assessment: UW2213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Machine Shops
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 140,000
ft2
Annual Production 19,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $349,395 3,469,661
kWh
Electricity Fees $10,482 -
Natural Gas $14,315 2,606
MMBtu
TOTAL YEARLY COSTS $374,192
RECOMMENDED SAVINGS* $11,915 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,539 $2,080 $4,539
45,390
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $6,610 - $6,610
66,102
kWh
-
03 2.7224: Reduce space conditioning during non-working hours $766 $380 - $766
-
MMBtu
TOTAL RECOMMENDED $11,915 $2,460 $11,149
111,491
kWh
$766
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs