ITAC Assessment: UW2211
ITAC logo
ITAC Assessment: UW2211
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Paper (except Newsprint) Mills.
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 106
Plant Area 50,000
ft2
Annual Production 8,125
ton
Production Hrs. Annual 5,200
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,931 790,974
kWh
Electricity Demand $15,525 2,535
kW-mo/yr
Electricity Fees $12,992 -
Natural Gas $9,695 797
MMBtu
Fuel Oil #1 $10,958 1,499
MMBtu
TOTAL YEARLY COSTS $107,101
RECOMMENDED SAVINGS* $10,612 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,612

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $3,539 $5,669 $3,539
48,344
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $2,053 $286 $1,721
23,510
kWh
$332
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,126 $6,616 $2,097
28,654
kWh
$28
-
kW-mo/yr
-
04 2.7224: Reduce space conditioning during non-working hours $708 $760 - - $708
-
MMBtu
05 2.7135: Install occupancy sensors $2,186 $1,771 $2,157
29,473
kWh
$29
-
kW-mo/yr
-
TOTAL RECOMMENDED $10,612 $15,102 $9,515
129,981
kWh
$389
-
kW-mo/yr
$708
-
MMBtu
TOTAL IMPLEMENTED $10,612 $15,102 $9,515
129,981
kWh
$389
-
kW-mo/yr
$708
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs