ITAC Assessment: UW2209
ITAC logo
ITAC Assessment: UW2209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Roasted Coffe, Single Serve Coffee, Bagged Coffee
NAICS 311920: Coffee and Tea Manufacturing
SIC 2095: Roasted Coffee
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 43,800
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,365 376,300
kWh
Electricity Demand $14,357 1,419
kW-mo/yr
Electricity Fees $5,079 -
Natural Gas $77,103 7,322
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $36,658 259,100
lb
TOTAL YEARLY COSTS $170,562
RECOMMENDED SAVINGS* $14,768 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,028

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,907 $2,080 $4,565
45,968
kWh
$1,342
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,845 $6,616 $2,845
28,654
kWh
- -
03 2.7135: Install occupancy sensors $2,927 $1,771 $2,927
29,473
kWh
- -
04 2.7224: Reduce space conditioning during non-working hours $2,276 - - - $2,276
-
MMBtu
05 2.4133: Use most efficient type of electric motors $814 $3,411 $814
8,193
kWh
- -
TOTAL RECOMMENDED $14,768 $13,878 $11,150
112,288
kWh
$1,342
-
kW-mo/yr
$2,276
-
MMBtu
TOTAL IMPLEMENTED $11,028 $8,696 $7,410
74,622
kWh
$1,342
-
kW-mo/yr
$2,276
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs