Assessment Year | 2006 |
---|---|
Principal Product | Nylon & Polypropylene yarn |
NAICS | 325220: Artificial and Synthetic Fibers and Filaments Manufacturing |
SIC | 2824: Manmade Organic Fibers, Except Cellulosic |
Sales Range | $100 M to 500M |
# of Employees | 367 |
Plant Area |
398,184
ft2
|
Annual Production | 64,000
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,975,396 | 90,163,524 |
kWh
|
$0.033 |
Electricity Demand | $229,177 | 149,760 |
kW-mo/yr
|
$1.53 |
Natural Gas | $17,312 | 1,364 |
MMBtu
|
$12.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $645,301 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $570,623 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Water Consumption Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.4156: Use flow control valves on equipment to optimize water use | $22,995 | $640 | - | - |
$16,203
-
Tgal
|
$6,792
-
Tgal
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,292 | $10,800 |
$3,292
99,757
kWh
|
- | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $97,628 | $18,865 |
$97,628
2,958,411
kWh
|
- | - | - | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $6,620 | $850 |
$6,620
200,626
kWh
|
- | - | - | - | |
05 | 2.2622: Replace existing chiller with high efficiency model | $60,069 | $87,937 |
$53,342
1,616,464
kWh
|
$6,727
-
kW-mo/yr
|
- | - | - | |
06 | 2.8112: Combine utility meters | $4,697 | - | - |
$4,697
-
kW-mo/yr
|
- | - | - | |
07 | 2.3511: Use plant owned transformers or lease transformers | $450,000 | $20,000 | - | - | - | - | $450,000 | |
TOTAL RECOMMENDED | $645,301 | $139,092 |
$160,882
4,875,258
kWh
|
$11,424
-
kW-mo/yr
|
$16,203
-
Tgal
|
$6,792
-
Tgal
|
$450,000 | ||
TOTAL IMPLEMENTED | $570,623 | $39,505 |
$97,628
2,958,411
kWh
|
- |
$16,203
-
Tgal
|
$6,792
-
Tgal
|
$450,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Water Consumption Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs