Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Plastics Packaging Film and Sheet (including Laminated) Manufacturing
NAICS 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 112,000
ft2
Annual Production 30,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,467 1,739,000
kWh
Natural Gas $104,529 12,865
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $56,760 1,033,960
lb
TOTAL YEARLY COSTS $312,756
RECOMMENDED SAVINGS* $169,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $169,997

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,645 $10,782 $16,645
191,101
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,233 $12,913 $9,233
106,006
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $8,538 $9,763 $8,538
98,024
kWh
04 2.9114: Use solar heat to make electricty $135,581 $876,160 $135,581
1,556,613
kWh
TOTAL RECOMMENDED $169,997 $909,618 $169,997
1,951,744
kWh
TOTAL IMPLEMENTED $169,997 $909,618 $169,997
1,951,744
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs