ITAC Assessment: MA0803
ITAC logo
ITAC Assessment: MA0803
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Commercial and Residential Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $500
k
to 1
M
# of Employees 20
Plant Area 479,160
ft2
Annual Production 30,660,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,073 2,098,400
kWh
Electricity Demand $20,301 3,580
kW-mo/yr
Electricity Fees $2,631 -
Natural Gas $30,470 2,883
MMBtu
Fuel Oil #2 $8,510 528
MMBtu
TOTAL YEARLY COSTS $302,985
RECOMMENDED SAVINGS* $13,962 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,437

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,194 $11,175 $9,194
79,944
kWh
- -
02 2.7221: Lower temperature during the winter season and vice-versa $2,308 $1,000 $2,044
17,772
kWh
- $264
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,935 $3,589 $1,589
13,816
kWh
$346
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $525 $2,000 $525
4,563
kWh
- -
TOTAL RECOMMENDED $13,962 $17,764 $13,352
116,095
kWh
$346
-
kW-mo/yr
$264
-
MMBtu
TOTAL IMPLEMENTED $13,437 $15,764 $12,827
111,532
kWh
$346
-
kW-mo/yr
$264
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs