Assessment Year | 2019 |
---|---|
Principal Product | Commercial and Residential Wastewater Treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $500 k to 1M |
# of Employees | 20 |
Plant Area |
479,160
ft2
|
Annual Production | 30,660,000,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $241,073 | 2,098,400 |
kWh
|
$0.11 |
Electricity Demand | $20,301 | 3,580 |
kW-mo/yr
|
$5.67 |
Electricity Fees | $2,631 | - |
|
- |
Natural Gas | $30,470 | 2,883 |
MMBtu
|
$10.57 |
Fuel Oil #2 | $8,510 | 528 |
MMBtu
|
$16.12 |
TOTAL YEARLY COSTS | $302,985 | |||
RECOMMENDED SAVINGS* | $13,962 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,437 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,194 | $11,175 |
$9,194
79,944
kWh
|
- | - | |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $2,308 | $1,000 |
$2,044
17,772
kWh
|
- |
$264
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,935 | $3,589 |
$1,589
13,816
kWh
|
$346
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $525 | $2,000 |
$525
4,563
kWh
|
- | - | |
TOTAL RECOMMENDED | $13,962 | $17,764 |
$13,352
116,095
kWh
|
$346
-
kW-mo/yr
|
$264
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,437 | $15,764 |
$12,827
111,532
kWh
|
$346
-
kW-mo/yr
|
$264
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs