ITAC Assessment: UW0045
ITAC logo
ITAC Assessment: UW0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 125,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $740,106 12,278,211
kWh
Electricity Demand $146,410 35,094
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,074 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,413

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $11,661 $48,908 $9,724
161,324
kWh
$1,937
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,963 $1,930 $9,052
147,663
kWh
$911
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,190 $28,362 $3,579
59,350
kWh
$611
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $5,260 $220 - - $5,260
-
MMBtu
TOTAL RECOMMENDED $31,074 $79,420 $22,355
368,337
kWh
$3,459
-
kW-mo/yr
$5,260
-
MMBtu
TOTAL IMPLEMENTED $19,413 $30,512 $12,631
207,013
kWh
$1,522
-
kW-mo/yr
$5,260
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs