ITAC Assessment: UW0043
ITAC logo
ITAC Assessment: UW0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 540,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,525,639 136,410,230
kWh
Electricity Demand $175,620 31,989
kW-mo/yr
Natural Gas $74,821 29,138
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,051 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $51,541 $123,392 $41,122
657,938
kWh
$10,419
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,988 $11,690 $10,127
162,036
kWh
$1,861
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,050 $9,050 $7,864
128,298
kWh
$1,186
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $1,472 $820 - - $1,472
-
MMBtu
TOTAL RECOMMENDED $74,051 $144,952 $59,113
948,272
kWh
$13,466
-
kW-mo/yr
$1,472
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs