Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Composites
NAICS 325314: Fertilizer (Mixing Only) Manufacturing
SIC 2875: Fertilizers, Mixing Only
Sales Range $50
M
to 100
M
# of Employees 108
Plant Area 40,000
ft2
Annual Production 2,500,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,620 952,332
kWh
Electricity Demand $13,764 2,640
kW-mo/yr
Natural Gas $93,096 8,994
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,341 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,420

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,711 $1,060 $3,437
38,189
kWh
$574
-
kW-mo/yr
- $(-1,300.0)
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $709 - - $709
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $921 $1,842 - - $921
-
MMBtu
-
TOTAL RECOMMENDED $4,341 $2,902 $3,437
38,189
kWh
$1,283
-
kW-mo/yr
$921
-
MMBtu
$(-1,300.0)
TOTAL IMPLEMENTED $3,420 $1,060 $3,437
38,189
kWh
$1,283
-
kW-mo/yr
- $(-1,300.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs