| Assessment Year | 2010 |
|---|---|
| Principal Product | Composites |
| NAICS | 325314: Fertilizer (Mixing Only) Manufacturing |
| SIC | 2875: Fertilizers, Mixing Only |
| Sales Range | $50 M to 100M |
| # of Employees | 108 |
| Plant Area |
40,000
ft2
|
| Annual Production | 2,500,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $67,620 | 952,332 |
kWh
|
$0.071 |
| Electricity Demand | $13,764 | 2,640 |
kW-mo/yr
|
$5.21 |
| Natural Gas | $93,096 | 8,994 |
MMBtu
|
$10.35 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $4,341 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,420 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,711 | $1,060 |
$3,437
38,189
kWh
|
$574
-
kW-mo/yr
|
- | $(-1,300.0) | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $709 | - | - |
$709
-
kW-mo/yr
|
- | - | |
| 03 | 2.2437: Recover waste heat from equipment | $921 | $1,842 | - | - |
$921
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $4,341 | $2,902 |
$3,437
38,189
kWh
|
$1,283
-
kW-mo/yr
|
$921
-
MMBtu
|
$(-1,300.0) | ||
| TOTAL IMPLEMENTED | $3,420 | $1,060 |
$3,437
38,189
kWh
|
$1,283
-
kW-mo/yr
|
- | $(-1,300.0) | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs