Assessment Year | 2021 |
---|---|
Principal Product | Asphalt Roofing Shingles |
NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
107,000
ft2
|
Annual Production | 1,500,000
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $406,691 | 3,503,968 |
kWh
|
$0.12 |
Electricity Demand | $112,867 | 7,987 |
kW-mo/yr
|
$14.13 |
Electricity Fees | $76,865 | - |
|
- |
TOTAL YEARLY COSTS | $596,423 | |||
RECOMMENDED SAVINGS* | $51,109 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,376 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,750 | $1,200 |
$16,220
139,700
kWh
|
$2,530
-
kW-mo/yr
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,064 | - |
$6,064
52,230
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,892 | $6,300 |
$4,180
36,004
kWh
|
$712
-
kW-mo/yr
|
|
04 | 2.6218: Turn off equipment when not in use | $9,562 | $3,960 |
$9,562
82,360
kWh
|
- | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $5,038 | $10,200 |
$4,052
34,900
kWh
|
$986
-
kW-mo/yr
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,802 | $4,200 |
$5,354
46,120
kWh
|
$1,448
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $51,109 | $25,860 |
$45,432
391,314
kWh
|
$5,677
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $34,376 | $5,160 |
$31,846
274,290
kWh
|
$2,530
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs