ITAC Assessment: SD0604
ITAC logo
ITAC Assessment: SD0604
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Asphalt Roofing Shingles
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 107,000
ft2
Annual Production 1,500,000
units
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $406,691 3,503,968
kWh
Electricity Demand $112,867 7,987
kW-mo/yr
Electricity Fees $76,865 -
TOTAL YEARLY COSTS $596,423
RECOMMENDED SAVINGS* $51,109 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,376

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,750 $1,200 $16,220
139,700
kWh
$2,530
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $6,064 - $6,064
52,230
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,892 $6,300 $4,180
36,004
kWh
$712
-
kW-mo/yr
04 2.6218: Turn off equipment when not in use $9,562 $3,960 $9,562
82,360
kWh
-
05 2.7232: Replace existing hvac unit with high efficiency model $5,038 $10,200 $4,052
34,900
kWh
$986
-
kW-mo/yr
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,802 $4,200 $5,354
46,120
kWh
$1,448
-
kW-mo/yr
TOTAL RECOMMENDED $51,109 $25,860 $45,432
391,314
kWh
$5,677
-
kW-mo/yr
TOTAL IMPLEMENTED $34,376 $5,160 $31,846
274,290
kWh
$2,530
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs