| Assessment Year | 2010 |
|---|---|
| Principal Product | Metal Finishers, X-Ray Laboratory |
| NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $1 M to 5M |
| # of Employees | 45 |
| Plant Area |
18,000
ft2
|
| Annual Production | 50,000
pieces
|
| Production Hrs. Annual | 4,992
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $105,090 | 1,463,960 |
kWh
|
$0.072 |
| Electricity Demand | $3,533 | 3,430 |
kW-mo/yr
|
$1.03 |
| Natural Gas | $35,161 | 28,249 |
MMBtu
|
$1.24 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,157 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $429 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $9,132 | - |
$1,834
54,176
kWh
|
$772
-
kW-mo/yr
|
$6,526
-
MMBtu
|
- | |
| 02 | 3.8142: Distill contaminated solvents for reuse | $7,344 | - | - | - | - |
$7,344
-
gal
|
|
| 03 | 2.2511: Insulate bare equipment | $5,340 | - |
$5,195
153,459
kWh
|
- | - |
$145
-
gal
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $620 | - |
$436
12,879
kWh
|
$184
-
kW-mo/yr
|
- | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $429 | - |
$346
10,211
kWh
|
$83
-
kW-mo/yr
|
- | - | |
| 06 | 2.7135: Install occupancy sensors | $292 | - |
$292
8,626
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $23,157 | - |
$8,103
239,351
kWh
|
$1,039
-
kW-mo/yr
|
$6,526
-
MMBtu
|
$7,489
-
gal
|
||
| TOTAL IMPLEMENTED | $429 | - |
$346
10,211
kWh
|
$83
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs