ITAC Assessment: UW0033
ITAC logo
ITAC Assessment: UW0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Metal Finishers, X-Ray Laboratory
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 18,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 4,992
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,090 1,463,960
kWh
Electricity Demand $3,533 3,430
kW-mo/yr
Natural Gas $35,161 28,249
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,157 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $429

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.6218: Turn off equipment when not in use $9,132 - $1,834
54,176
kWh
$772
-
kW-mo/yr
$6,526
-
MMBtu
-
02 3.8142: Distill contaminated solvents for reuse $7,344 - - - - $7,344
-
gal
03 2.2511: Insulate bare equipment $5,340 - $5,195
153,459
kWh
- - $145
-
gal
04 2.7142: Utilize higher efficiency lamps and/or ballasts $620 - $436
12,879
kWh
$184
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $429 - $346
10,211
kWh
$83
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $292 - $292
8,626
kWh
- - -
TOTAL RECOMMENDED $23,157 - $8,103
239,351
kWh
$1,039
-
kW-mo/yr
$6,526
-
MMBtu
$7,489
-
gal
TOTAL IMPLEMENTED $429 - $346
10,211
kWh
$83
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs