| Assessment Year | 1994 |
|---|---|
| Principal Product | Reinforced plastic bags, reinforced plastic sheets and tubes |
| NAICS |
n/a
|
| SIC | 2673: Plastics, Foil, and Coated Paper Bags |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
65,200
ft2
|
| Annual Production | 4,200,000
lb
|
| Production Hrs. Annual | 6,800
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $271,925 | 4,300,117 |
kWh
|
$0.063 |
| Natural Gas | $53,966 | 10,213 |
MMBtu
|
$5.28 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $53,671 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $49,756 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $14,843 | $23,805 | - | - | $14,843 | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $9,830 | - | - | - | $9,830 | |
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $9,430 | - | - | - | $9,430 | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,170 | $630 |
$8,170
-
kWh
|
- | - | |
| 05 | 2.2511: Insulate bare equipment | $3,660 | $1,890 |
$3,660
124,853
kWh
|
- | - | |
| 06 | 2.7145: Install skylights | $3,915 | - |
$3,915
133,646
kWh
|
- | - | |
| 07 | 2.2511: Insulate bare equipment | $2,800 | $490 | - |
$2,800
-
MMBtu
|
- | |
| 08 | 2.7124: Make a practice of turning off lights when not needed | $590 | $80 |
$590
9,672
kWh
|
- | - | |
| 09 | 2.6212: Turn off equipment during breaks, reduce operating time | $433 | - |
$433
14,654
kWh
|
- | - | |
| TOTAL RECOMMENDED | $53,671 | $26,895 |
$16,768
282,825
kWh
|
$2,800
-
MMBtu
|
$34,103 | ||
| TOTAL IMPLEMENTED | $49,756 | $26,895 |
$12,853
149,179
kWh
|
$2,800
-
MMBtu
|
$34,103 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs