ITAC Assessment: UW0023
ITAC logo
ITAC Assessment: UW0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Cereal Products
NAICS 311230: Breakfast Cereal Manufacturing
SIC 2043: Cereal Breakfast Foods
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 105,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $403,840 6,462,105
kWh
Electricity Demand $56,824 12,771
kW-mo/yr
Natural Gas $438,697 43,055
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,344 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,092

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,974 $120,000 $21,710
330,620
kWh
$2,264
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,851 $2,500 $13,603
183,612
kWh
$1,248
-
kW-mo/yr
-
03 2.1133: Adjust burners for efficient operation $7,267 $200,000 - - $7,267
-
MMBtu
04 2.1111: Control pressure on steamer operations $6,132 - - - $6,132
-
MMBtu
05 2.2437: Recover waste heat from equipment $4,120 $60,200 - - $4,120
-
MMBtu
TOTAL RECOMMENDED $56,344 $382,700 $35,313
514,232
kWh
$3,512
-
kW-mo/yr
$17,519
-
MMBtu
TOTAL IMPLEMENTED $46,092 $322,500 $35,313
514,232
kWh
$3,512
-
kW-mo/yr
$7,267
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs