| Assessment Year | 2009 |
|---|---|
| Principal Product | Cereal Products |
| NAICS | 311230: Breakfast Cereal Manufacturing |
| SIC | 2043: Cereal Breakfast Foods |
| Sales Range | $50 M to 100M |
| # of Employees | 140 |
| Plant Area |
105,000
ft2
|
| Annual Production | 100,000,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $403,840 | 6,462,105 |
kWh
|
$0.062 |
| Electricity Demand | $56,824 | 12,771 |
kW-mo/yr
|
$4.45 |
| Natural Gas | $438,697 | 43,055 |
MMBtu
|
$10.19 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $56,344 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $46,092 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,974 | $120,000 |
$21,710
330,620
kWh
|
$2,264
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $14,851 | $2,500 |
$13,603
183,612
kWh
|
$1,248
-
kW-mo/yr
|
- | |
| 03 | 2.1133: Adjust burners for efficient operation | $7,267 | $200,000 | - | - |
$7,267
-
MMBtu
|
|
| 04 | 2.1111: Control pressure on steamer operations | $6,132 | - | - | - |
$6,132
-
MMBtu
|
|
| 05 | 2.2437: Recover waste heat from equipment | $4,120 | $60,200 | - | - |
$4,120
-
MMBtu
|
|
| TOTAL RECOMMENDED | $56,344 | $382,700 |
$35,313
514,232
kWh
|
$3,512
-
kW-mo/yr
|
$17,519
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $46,092 | $322,500 |
$35,313
514,232
kWh
|
$3,512
-
kW-mo/yr
|
$7,267
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs