Assessment Year | 2008 |
---|---|
Principal Product | Baked Goods |
NAICS | 311811: Retail Bakeries |
SIC | 5461: Retail Bakeries |
Sales Range | less than $500 k |
# of Employees | 135 |
Plant Area |
150,000
ft2
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $318,017 | 6,482,887 |
kWh
|
$0.049 |
Electricity Demand | $7,736 | 12,210 |
kW-mo/yr
|
$0.63 |
Electricity Fees | $3,206 | - |
|
- |
Natural Gas | $975,211 | 90,404 |
MMBtu
|
$10.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $91,628 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $52,486 | $175,000 | - | - | - |
$52,486
-
MMBtu
|
|
02 | 2.1212: Operate boilers on high fire setting | $20,223 | $49,000 | - | - | - |
$20,223
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,357 | $5,912 |
$9,346
186,921
kWh
|
$11
-
kW-mo/yr
|
- | - | |
04 | 2.4322: Use or replace with energy efficient substitutes | $5,612 | $50,000 |
$5,492
109,844
kWh
|
$120
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,472 | - |
$3,398
67,963
kWh
|
- | $74 | - | |
06 | 2.7135: Install occupancy sensors | $478 | $450 |
$478
9,560
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $91,628 | $280,362 |
$18,714
374,288
kWh
|
$131
-
kW-mo/yr
|
$74 |
$72,709
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs