ITAC Assessment: UW0021
ITAC logo
ITAC Assessment: UW0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Baked Goods
NAICS 311811: Retail Bakeries
SIC 5461: Retail Bakeries
Sales Range less than $500
k
# of Employees 135
Plant Area 150,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $318,017 6,482,887
kWh
Electricity Demand $7,736 12,210
kW-mo/yr
Electricity Fees $3,206 -
Natural Gas $975,211 90,404
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,628 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $52,486 $175,000 - - - $52,486
-
MMBtu
02 2.1212: Operate boilers on high fire setting $20,223 $49,000 - - - $20,223
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,357 $5,912 $9,346
186,921
kWh
$11
-
kW-mo/yr
- -
04 2.4322: Use or replace with energy efficient substitutes $5,612 $50,000 $5,492
109,844
kWh
$120
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,472 - $3,398
67,963
kWh
- $74 -
06 2.7135: Install occupancy sensors $478 $450 $478
9,560
kWh
- - -
TOTAL RECOMMENDED $91,628 $280,362 $18,714
374,288
kWh
$131
-
kW-mo/yr
$74 $72,709
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs