| Assessment Year | 2008 |
|---|---|
| Principal Product | Brass and Aluminum Castings |
| NAICS | 331524: Aluminum Foundries (except Die-Casting) |
| SIC | 3365: Aluminum Foundries |
| Sales Range | $1 M to 5M |
| # of Employees | 23 |
| Plant Area |
13,000
ft2
|
| Annual Production | 50,000
pieces
|
| Production Hrs. Annual | 3,900
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $29,113 | 570,496 |
kWh
|
$0.051 |
| Electricity Demand | $3,956 | 3,841 |
kW-mo/yr
|
$1.03 |
| Electricity Fees | $919 | - |
|
- |
| Natural Gas | $44,470 | 3,807 |
MMBtu
|
$11.68 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $80,971 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 4.712: Utilize job costing software | $55,734 | $72,000 | - | - |
$55,734
-
MMBtu
|
|
| 02 | 2.4322: Use or replace with energy efficient substitutes | $12,434 | $34,000 |
$11,692
250,380
kWh
|
$742
-
kW-mo/yr
|
- | |
| 03 | 2.2515: Use optimum thickness insulation | $9,391 | $39,900 | - | - |
$9,391
-
MMBtu
|
|
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,375 | $4,328 |
$2,375
50,856
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,037 | $2,775 |
$1,037
21,966
kWh
|
- | - | |
| TOTAL RECOMMENDED | $80,971 | $153,003 |
$15,104
323,202
kWh
|
$742
-
kW-mo/yr
|
$65,125
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs