ITAC Assessment: UW0018
ITAC logo
ITAC Assessment: UW0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Brass and Aluminum Castings
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3365: Aluminum Foundries
Sales Range $1
M
to 5
M
# of Employees 23
Plant Area 13,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 3,900
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,113 570,496
kWh
Electricity Demand $3,956 3,841
kW-mo/yr
Electricity Fees $919 -
Natural Gas $44,470 3,807
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,971 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 4.712: Utilize job costing software $55,734 $72,000 - - $55,734
-
MMBtu
02 2.4322: Use or replace with energy efficient substitutes $12,434 $34,000 $11,692
250,380
kWh
$742
-
kW-mo/yr
-
03 2.2515: Use optimum thickness insulation $9,391 $39,900 - - $9,391
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,375 $4,328 $2,375
50,856
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,037 $2,775 $1,037
21,966
kWh
- -
TOTAL RECOMMENDED $80,971 $153,003 $15,104
323,202
kWh
$742
-
kW-mo/yr
$65,125
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs