Assessment Year | 2008 |
---|---|
Principal Product | Brass and Aluminum Castings |
NAICS | 331524: Aluminum Foundries (except Die-Casting) |
SIC | 3365: Aluminum Foundries |
Sales Range | $1 M to 5M |
# of Employees | 23 |
Plant Area |
13,000
ft2
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 3,900
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $29,113 | 570,496 |
kWh
|
$0.051 |
Electricity Demand | $3,956 | 3,841 |
kW-mo/yr
|
$1.03 |
Electricity Fees | $919 | - |
|
- |
Natural Gas | $44,470 | 3,807 |
MMBtu
|
$11.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $80,971 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 4.712: Utilize job costing software | $55,734 | $72,000 | - | - |
$55,734
-
MMBtu
|
|
02 | 2.4322: Use or replace with energy efficient substitutes | $12,434 | $34,000 |
$11,692
250,380
kWh
|
$742
-
kW-mo/yr
|
- | |
03 | 2.2515: Use optimum thickness insulation | $9,391 | $39,900 | - | - |
$9,391
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,375 | $4,328 |
$2,375
50,856
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,037 | $2,775 |
$1,037
21,966
kWh
|
- | - | |
TOTAL RECOMMENDED | $80,971 | $153,003 |
$15,104
323,202
kWh
|
$742
-
kW-mo/yr
|
$65,125
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs