Assessment Year | 2008 |
---|---|
Principal Product | Tofu and Tofu Products |
NAICS | 311999: All Other Miscellaneous Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 22 |
Plant Area |
10,000
ft2
|
Annual Production | 540,000
lb
|
Production Hrs. Annual | 3,510
hrs
|
Location (State) | Hawaii |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $14,635 | 73,415 |
kWh
|
$0.20 |
Electricity Demand | $1,718 | 300 |
kW-mo/yr
|
$5.73 |
Natural Gas | $82,543 | 2,419 |
MMBtu
|
$34.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $63,155 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,263 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $29,638 | - | - | - |
$29,638
-
MMBtu
|
- | |
02 | 2.1224: Replace boiler | $10,000 | $20,000 | - | - |
$10,000
-
MMBtu
|
- | |
03 | 2.2113: Repair or replace steam traps | $5,490 | $5,600 | - | - |
$5,490
-
MMBtu
|
- | |
04 | 2.2511: Insulate bare equipment | $7,000 | $500 | - | - |
$7,000
-
MMBtu
|
- | |
05 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $4,625 | $8,550 |
$4,608
24,255
kWh
|
$17
-
kW-mo/yr
|
- | - | |
06 | 3.4156: Use flow control valves on equipment to optimize water use | $5,510 | $10 | - | - | - |
$5,510
-
Tgal
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $892 | - |
$808
4,255
kWh
|
$84
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $63,155 | $34,660 |
$5,416
28,510
kWh
|
$101
-
kW-mo/yr
|
$52,128
-
MMBtu
|
$5,510
-
Tgal
|
||
TOTAL IMPLEMENTED | $41,263 | $9,050 |
$4,608
24,255
kWh
|
$17
-
kW-mo/yr
|
$36,638
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs