ITAC Assessment: UW0015
ITAC logo
ITAC Assessment: UW0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Plastic and Cardboard Packaging
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $1
M
to 5
M
# of Employees 14
Plant Area 16,000
ft2
Annual Production 50,000
units
Production Hrs. Annual 2,210
hrs
Location (State) Hawaii

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,080 318,461
kWh
Electricity Demand $7,796 1,359
kW-mo/yr
Electricity Fees $21,959 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,204 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4321: Upgrade obsolete equipment $14,766 $42,706 $12,509
72,305
kWh
$2,257
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,107 $3,180 $931
5,291
kWh
$176
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,010 - $856
4,946
kWh
$154
-
kW-mo/yr
04 2.6211: Conserve energy by efficient use of vending machines $321 $189 $321
1,825
kWh
-
TOTAL RECOMMENDED $17,204 $46,075 $14,617
84,367
kWh
$2,587
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs