ITAC Assessment: CM1054
ITAC logo
ITAC Assessment: CM1054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Candy and other Confectionary Products
NAICS 311352: Confectionery Manufacturing from Purchased Chocolate
SIC 2064: Candy and Other Confectionery Products
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 55,000
ft2
Annual Production 2,500,000
units
Production Hrs. Annual 3,796
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,979 2,487,639
kWh
Electricity Demand $143,697 5,398
kW-mo/yr
Electricity Fees $39,676 -
Natural Gas $35,224 5,548
MMBtu
Waste Disposal Costs
Water Usage $27,949 4,353
Tgal
TOTAL YEARLY COSTS $351,525
RECOMMENDED SAVINGS* $85,435 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $64,195 $995,000 $32,201
763,046
kWh
$31,994
-
kW-mo/yr
- - -
02 2.8226: Increase efficiency of trucks $15,742 $48,539 $142
3,353
kWh
- - - $15,600
03 2.7492: Use proper thickness of insulation on building envelope $1,940 $8,969 $449
10,649
kWh
- $1,491
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $988 $179 $336
7,960
kWh
$652
-
kW-mo/yr
- - -
05 3.4151: Minimize water usage $813 $50 - - - $813
-
Tgal
-
06 2.7491: Insulate glazing, walls, ceilings, and roofs $781 $2,857 $181
4,285
kWh
- $600
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $712 $1,512 $247
5,853
kWh
$465
-
kW-mo/yr
- - -
08 2.2136: Install / repair insulation on steam lines $113 $650 - - $113
-
MMBtu
- -
09 2.7134: Use photocell controls $73 $70 $68
1,605
kWh
$5
-
kW-mo/yr
- - -
10 2.7131: Add area lighting switches $46 $111 $46
1,081
kWh
- - - -
11 2.7491: Insulate glazing, walls, ceilings, and roofs $33 $685 $7
174
kWh
- $25
-
MMBtu
- -
TOTAL RECOMMENDED $85,435 $1,058,622 $33,677
798,006
kWh
$33,116
-
kW-mo/yr
$2,229
-
MMBtu
$813
-
Tgal
$15,600
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs