| Assessment Year | 2025 |
|---|---|
| Principal Product | Candy and other Confectionary Products |
| NAICS | 311352: Confectionery Manufacturing from Purchased Chocolate |
| SIC | 2064: Candy and Other Confectionery Products |
| Sales Range | $10 M to 50M |
| # of Employees | 75 |
| Plant Area |
55,000
ft2
|
| Annual Production | 2,500,000
units
|
| Production Hrs. Annual | 3,796
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $104,979 | 2,487,639 |
kWh
|
$0.042 | |
| Electricity Demand | $143,697 | 5,398 |
kW-mo/yr
|
$26.62 | |
| Electricity Fees | $39,676 | - |
|
- | |
| Natural Gas | $35,224 | 5,548 |
MMBtu
|
$6.35 | |
| Waste Disposal Costs | |||||
| Water Usage | $27,949 | 4,353 |
Tgal
|
$6.42 | |
| TOTAL YEARLY COSTS | $351,525 | ||||
| RECOMMENDED SAVINGS* | $85,435 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $64,195 | $995,000 |
$32,201
763,046
kWh
|
$31,994
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.8226: Increase efficiency of trucks | $15,742 | $48,539 |
$142
3,353
kWh
|
- | - | - | $15,600 | |
| 03 | 2.7492: Use proper thickness of insulation on building envelope | $1,940 | $8,969 |
$449
10,649
kWh
|
- |
$1,491
-
MMBtu
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $988 | $179 |
$336
7,960
kWh
|
$652
-
kW-mo/yr
|
- | - | - | |
| 05 | 3.4151: Minimize water usage | $813 | $50 | - | - | - |
$813
-
Tgal
|
- | |
| 06 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $781 | $2,857 |
$181
4,285
kWh
|
- |
$600
-
MMBtu
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $712 | $1,512 |
$247
5,853
kWh
|
$465
-
kW-mo/yr
|
- | - | - | |
| 08 | 2.2136: Install / repair insulation on steam lines | $113 | $650 | - | - |
$113
-
MMBtu
|
- | - | |
| 09 | 2.7134: Use photocell controls | $73 | $70 |
$68
1,605
kWh
|
$5
-
kW-mo/yr
|
- | - | - | |
| 10 | 2.7131: Add area lighting switches | $46 | $111 |
$46
1,081
kWh
|
- | - | - | - | |
| 11 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $33 | $685 |
$7
174
kWh
|
- |
$25
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $85,435 | $1,058,622 |
$33,677
798,006
kWh
|
$33,116
-
kW-mo/yr
|
$2,229
-
MMBtu
|
$813
-
Tgal
|
$15,600 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs