ITAC Assessment: UW0014
ITAC logo
ITAC Assessment: UW0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Commercial Printed Products
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 80,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 5,920
hrs
Location (State) Hawaii

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,947 4,020,000
kWh
Electricity Demand $102,056 10,763
kW-mo/yr
Natural Gas $136,794 5,152
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $198,822 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,835

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2515: Use optimum thickness insulation $118,896 $114,435 $118,896
641,302
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $40,835 $57,573 $36,554
220,207
kWh
$4,281
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,004 $13,992 $17,004
102,105
kWh
-
04 2.2628: Utilize a less expensive cooling method $12,247 $70,905 $12,247
70,770
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,513 $5,640 $7,513
45,264
kWh
-
06 2.7135: Install occupancy sensors $2,327 $1,500 $2,327
14,023
kWh
-
TOTAL RECOMMENDED $198,822 $264,045 $194,541
1,093,671
kWh
$4,281
-
kW-mo/yr
TOTAL IMPLEMENTED $40,835 $57,573 $36,554
220,207
kWh
$4,281
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs