ITAC Assessment: UW0008
ITAC logo
ITAC Assessment: UW0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product PVC Spacers for Insulated Glass Windows and Doors
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 195
Plant Area 129,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,568
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $842,179 24,875,333
kWh
Electricity Demand $264,693 44,636
kW-mo/yr
Electricity Fees $4,098 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $166,565 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $166,334

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.5196: Use small number of high output units instead of many small inefficient units $136,932 $492,147 $114,690
2,730,622
kWh
$22,242
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $24,830 $81,585 $19,939
588,930
kWh
$4,891
-
kW-mo/yr
03 2.4133: Use most efficient type of electric motors $3,480 $11,244 $2,760
81,600
kWh
$720
-
kW-mo/yr
04 2.7135: Install occupancy sensors $1,092 $700 $1,092
32,241
kWh
-
05 2.6242: Minimize operation of equipment maintained in standby condition $231 $650 $204
6,023
kWh
$27
-
kW-mo/yr
TOTAL RECOMMENDED $166,565 $586,326 $138,685
3,439,416
kWh
$27,880
-
kW-mo/yr
TOTAL IMPLEMENTED $166,334 $585,676 $138,481
3,433,393
kWh
$27,853
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs