Assessment Year | 2004 |
---|---|
Principal Product | Raw Milk |
NAICS | 112120: Dairy Cattle and Milk Production |
SIC | 241: Logging |
Sales Range | $50 M to 100M |
# of Employees | 120 |
Plant Area |
1,000,000
ft2
|
Annual Production | 219,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $672,521 | 10,143,272 |
kWh
|
$0.066 |
Electricity Demand | $38,164 | 28,213 |
kW-mo/yr
|
$1.35 |
LPG | $25,000 | 2,855 |
MMBtu
|
$8.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,118 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,209 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,696 | $45 |
$5,539
84,700
kWh
|
$157
-
kW-mo/yr
|
- | |
02 | 2.9112: Use solar heat to heat water | $6,129 | $24,120 | - | - |
$6,129
-
MMBtu
|
|
03 | 2.2511: Insulate bare equipment | $1,197 | $468 | - | - |
$1,197
-
MMBtu
|
|
04 | 2.4133: Use most efficient type of electric motors | $16,379 | $74,008 |
$15,929
243,576
kWh
|
$450
-
kW-mo/yr
|
- | |
05 | 2.4313: Provide proper maintenance of motor driven equipment | $396 | $30 |
$385
5,891
kWh
|
$11
-
kW-mo/yr
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $738 | $30 |
$729
11,160
kWh
|
$9
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,583 | $6,928 |
$2,511
38,389
kWh
|
$72
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $33,118 | $105,629 |
$25,093
383,716
kWh
|
$699
-
kW-mo/yr
|
$7,326
-
MMBtu
|
||
TOTAL IMPLEMENTED | $23,209 | $74,113 |
$22,582
345,327
kWh
|
$627
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs