ITAC Assessment: AS0381
ITAC logo
ITAC Assessment: AS0381
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Raw Milk
NAICS 112120: Dairy Cattle and Milk Production
SIC 241: Logging
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 1,000,000
ft2
Annual Production 219,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $672,521 10,143,272
kWh
Electricity Demand $38,164 28,213
kW-mo/yr
LPG $25,000 2,855
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,118 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,209

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,696 $45 $5,539
84,700
kWh
$157
-
kW-mo/yr
-
02 2.9112: Use solar heat to heat water $6,129 $24,120 - - $6,129
-
MMBtu
03 2.2511: Insulate bare equipment $1,197 $468 - - $1,197
-
MMBtu
04 2.4133: Use most efficient type of electric motors $16,379 $74,008 $15,929
243,576
kWh
$450
-
kW-mo/yr
-
05 2.4313: Provide proper maintenance of motor driven equipment $396 $30 $385
5,891
kWh
$11
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $738 $30 $729
11,160
kWh
$9
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,583 $6,928 $2,511
38,389
kWh
$72
-
kW-mo/yr
-
TOTAL RECOMMENDED $33,118 $105,629 $25,093
383,716
kWh
$699
-
kW-mo/yr
$7,326
-
MMBtu
TOTAL IMPLEMENTED $23,209 $74,113 $22,582
345,327
kWh
$627
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs