ITAC Assessment: UW0003
ITAC logo
ITAC Assessment: UW0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Cockpit lighting and instrumentation panels
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 162
Plant Area 31,000
ft2
Annual Production 1
units
Production Hrs. Annual 5,720
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,612 1,173,960
kWh
Electricity Demand $20,402 3,264
kW-mo/yr
Electricity Fees $1,423 -
Natural Gas $76,191 6,383
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,493 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,385

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Increase in Production Savings
01 2.7232: Replace existing hvac unit with high efficiency model $7,385 $50,000 $6,985
114,516
kWh
- - $400 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $929 $2,100 $1,835
30,077
kWh
$394
-
kW-mo/yr
- $(-1,300.0) -
03 2.7425: Clean or color roof to reduce solar load $5,723 $20,750 $473
7,750
kWh
- $750
-
MMBtu
$(-500.0) $5,000
04 2.6121: Reduce hot water temperature to the minimum required $1,551 $7,020 - - $1,551
-
MMBtu
- -
05 2.7135: Install occupancy sensors $905 $1,200 $905
14,833
kWh
- - - -
TOTAL RECOMMENDED $16,493 $81,070 $10,198
167,176
kWh
$394
-
kW-mo/yr
$2,301
-
MMBtu
$(-1,400.0) $5,000
TOTAL IMPLEMENTED $3,385 $10,320 $2,740
44,910
kWh
$394
-
kW-mo/yr
$1,551
-
MMBtu
$(-1,300.0) -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs