Assessment Year | 2007 |
---|---|
Principal Product | Cockpit lighting and instrumentation panels |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 162 |
Plant Area |
31,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 5,720
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,612 | 1,173,960 |
kWh
|
$0.061 |
Electricity Demand | $20,402 | 3,264 |
kW-mo/yr
|
$6.25 |
Electricity Fees | $1,423 | - |
|
- |
Natural Gas | $76,191 | 6,383 |
MMBtu
|
$11.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,493 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,385 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $7,385 | $50,000 |
$6,985
114,516
kWh
|
- | - | $400 | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $929 | $2,100 |
$1,835
30,077
kWh
|
$394
-
kW-mo/yr
|
- | $(-1,300.0) | - | |
03 | 2.7425: Clean or color roof to reduce solar load | $5,723 | $20,750 |
$473
7,750
kWh
|
- |
$750
-
MMBtu
|
$(-500.0) | $5,000 | |
04 | 2.6121: Reduce hot water temperature to the minimum required | $1,551 | $7,020 | - | - |
$1,551
-
MMBtu
|
- | - | |
05 | 2.7135: Install occupancy sensors | $905 | $1,200 |
$905
14,833
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $16,493 | $81,070 |
$10,198
167,176
kWh
|
$394
-
kW-mo/yr
|
$2,301
-
MMBtu
|
$(-1,400.0) | $5,000 | ||
TOTAL IMPLEMENTED | $3,385 | $10,320 |
$2,740
44,910
kWh
|
$394
-
kW-mo/yr
|
$1,551
-
MMBtu
|
$(-1,300.0) | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs