ITAC Assessment: UU0308
ITAC logo
ITAC Assessment: UU0308
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Patient Care, Pharmacy
NAICS 621498: All Other Outpatient Care Centers
SIC 8093: Specialty Outpatient Facilities, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 30
Plant Area 39,000
ft2
Annual Production 1
units
Production Hrs. Annual 3,120
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,249 657,200
kWh
Electricity Demand $25,946 1,548
kW-mo/yr
Electricity Fees $20,250 -
Natural Gas $11,320 1,345
MMBtu
TOTAL YEARLY COSTS $81,765
RECOMMENDED SAVINGS* $13,506 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $451 $2,370 $340
9,204
kWh
$111
-
kW-mo/yr
-
02 2.7234: Use heat pump for space conditioning $6,411 $23,825 $(-2,442.0)
66,000
kWh
$(-201.1)
-
kW-mo/yr
$9,055
-
MMBtu
03 2.7226: Use computer programs to optimize hvac performance $481 $1,500 $481
13,000
kWh
- -
04 2.7226: Use computer programs to optimize hvac performance $6,163 $18,480 $2,432
65,720
kWh
$2,595
-
kW-mo/yr
$1,136
-
MMBtu
TOTAL RECOMMENDED $13,506 $46,175 $811
153,924
kWh
$2,504
-
kW-mo/yr
$10,191
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs