ITAC Assessment: IC0024
ITAC logo
ITAC Assessment: IC0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Brass and Ferrous Castings
NAICS
n/a
SIC 3366: Copper Foundries
Sales Range $10
M
to 50
M
# of Employees 149
Plant Area 87,100
ft2
Annual Production 3,500,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $271,804 8,377,352
kWh
Electricity Demand $224,747 17,014
kW-mo/yr
Electricity Fees $58,001 -
Natural Gas $62,174 6,724
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,232,435 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $392,179

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.1117: Relocate oven / furnace to more efficient location $27,240 $6,825 $17,250
492,800
kWh
$9,990
-
kW-mo/yr
- - - - - -
02 2.3191: Use demand controller or load shedder $11,240 $3,280 - $11,240
-
kW-mo/yr
- - - - - -
03 2.1121: Use insulation in furnaces to facilitate heating / cooling $7,403 $2,000 $7,403
56,136
kWh
- - - - - - -
04 2.1121: Use insulation in furnaces to facilitate heating / cooling $1,943 $4,000 $1,943
55,503
kWh
- - - - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,634 $4,300 $8,156
233,037
kWh
$5,478
-
kW-mo/yr
- - - - - -
06 2.4321: Upgrade obsolete equipment $9,500 $16,800 $5,670
162,000
kWh
$3,830
-
kW-mo/yr
- - - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $9,642 $32,917 $5,079
145,119
kWh
$3,804
-
kW-mo/yr
- - $1,192 - - $(-433.0)
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,811 $7,956 $682
19,476
kWh
$1,101
-
kW-mo/yr
- - $29 - - $(-1.0)
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,134 $945 $210
5,992
kWh
$106
-
kW-mo/yr
- - $674 - - $144
10 2.6232: Install set-back timers $4,823 $968 - - $4,823
-
MMBtu
- - - - -
11 2.6232: Install set-back timers $2,245 $1,741 - - $2,245
-
MMBtu
- - - - -
12 3.5221: Recycle casting sand $765,000 - - - - $790,000
-
lb
- - $(-25,000.0) -
13 4.521: Clear and rent existing space $365,820 $3,920 - - - - - $365,820 - -
14 4.423: Move product using mechanical means $11,000 $7,000 - - - - $11,000 - - -
TOTAL RECOMMENDED $1,232,435 $92,652 $46,393
1,170,063
kWh
$35,549
-
kW-mo/yr
$7,068
-
MMBtu
$790,000
-
lb
$12,895 $365,820 $(-25,000.0) $(-290.0)
TOTAL IMPLEMENTED $392,179 $16,906 $17,712
350,668
kWh
$5,584
-
kW-mo/yr
$2,245
-
MMBtu
- $674 $365,820 - $144
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs