ITAC Assessment: UU0307
ITAC logo
ITAC Assessment: UU0307
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Outpatient care
NAICS 621498: All Other Outpatient Care Centers
SIC 8062: General Medical and Surgical Hospitals
Sales Range less than $500
k
# of Employees 75
Plant Area 20,000
ft2
Annual Production 80,000
units
Production Hrs. Annual 4,275
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,456 368,840
kWh
Electricity Demand $15,255 919
kW-mo/yr
Natural Gas $8,184 992
MMBtu
TOTAL YEARLY COSTS $36,895
RECOMMENDED SAVINGS* $6,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7225: Close outdoor air dampers during warm-up / cool-down periods $1,950 $4,000 $1,950
31,900
kWh
-
02 2.7226: Use computer programs to optimize hvac performance $2,800 $8,580 $2,800
45,900
kWh
-
03 2.1224: Replace boiler $1,650 $37,000 - $1,650
-
MMBtu
TOTAL RECOMMENDED $6,400 $49,580 $4,750
77,800
kWh
$1,650
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs