ITAC Assessment: UU0288
ITAC logo
ITAC Assessment: UU0288
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Farm Machinery and Equipment
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 485
Plant Area 375,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 5,684
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $190,040 4,275,121
kWh
Electricity Demand $127,369 11,525
kW-mo/yr
Electricity Fees $42,262 -
Natural Gas $173,687 45,680
MMBtu
TOTAL YEARLY COSTS $533,358
RECOMMENDED SAVINGS* $942,372 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 4.631: Install an uninteruptable power supply $915,000 $1,225,000 - - - $915,000
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,190 $15,750 - $9,190
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $15,325 $47,180 - - $15,325
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $832 $5,310 $(-210.0)
(-4,762)
kWh
$(-480.0)
-
kW-mo/yr
$1,522
-
MMBtu
-
05 2.4239: Eliminate or reduce compressed air usage $2,025 $6,732 $1,376
31,262
kWh
$649
-
kW-mo/yr
- -
TOTAL RECOMMENDED $942,372 $1,299,972 $1,166
26,500
kWh
$9,359
-
kW-mo/yr
$16,847
-
MMBtu
$915,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs