ITAC Assessment: UU0277
ITAC logo
ITAC Assessment: UU0277
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Ice rink
NAICS 713940: Fitness and Recreational Sports Centers
SIC 7999: Amusement and Recreation Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 120,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,032
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,920 2,355,840
kWh
Electricity Demand $64,696 4,387
kW-mo/yr
Electricity Fees $10,750 -
Natural Gas $71,970 7,470
MMBtu
TOTAL YEARLY COSTS $255,336
RECOMMENDED SAVINGS* $66,391 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7243: Improve air circulation with destratification fans / other methods $12,948 $57,090 $(-60.0)
(-1,350)
kWh
$(-381.6)
-
kW-mo/yr
$13,390
-
MMBtu
-
02 2.7496: Install partitions to reduce size of conditioned space $4,322 $21,080 $660
14,420
kWh
$292
-
kW-mo/yr
$3,370
-
MMBtu
-
03 2.7496: Install partitions to reduce size of conditioned space $2,977 $13,970 $463
10,020
kWh
$202
-
kW-mo/yr
$2,311
-
MMBtu
-
04 2.7491: Insulate glazing, walls, ceilings, and roofs $29,270 $414,260 $29,270
633,600
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $16,874 $41,100 $4,200
90,390
kWh
$2,194
-
kW-mo/yr
- $10,480
TOTAL RECOMMENDED $66,391 $547,500 $34,533
747,080
kWh
$2,306
-
kW-mo/yr
$19,071
-
MMBtu
$10,480
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs