ITAC Assessment: AM0615
ITAC logo
ITAC Assessment: AM0615
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Railroad ties
NAICS 326130: Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 50,000
ft2
Annual Production 1,388,277
pieces
Production Hrs. Annual 3,528
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $249,356 5,048,000
kWh
Electricity Demand $95,634 11,160
kW-mo/yr
Electricity Fees $4,627 -
Natural Gas $476,413 85,973
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $558,336 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,800

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $455,515 $1,000,000 $89,868
1,695,619
kWh
$19,969
-
kW-mo/yr
$476,413
-
MMBtu
$(-130,735.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $35,021 $107,528 $24,258
457,697
kWh
$10,763
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,924 $900 $10,956
206,720
kWh
$6,968
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $13,856 $27,318 $9,515
179,520
kWh
$4,341
-
kW-mo/yr
- -
05 2.7134: Use photocell controls $13,704 $10,754 $13,704
258,570
kWh
- - -
06 2.2113: Repair or replace steam traps $10,200 $273 - - $10,200
-
MMBtu
-
07 2.4133: Use most efficient type of electric motors $5,909 $27,494 $3,047
57,492
kWh
$2,862
-
kW-mo/yr
- -
08 2.2136: Install / repair insulation on steam lines $3,659 $875 - - $3,659
-
MMBtu
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,788 $13 $1,200
23,000
kWh
$588
-
kW-mo/yr
- -
10 2.4314: Use synthetic lubricant $760 - $386
7,292
kWh
$374
-
kW-mo/yr
- -
TOTAL RECOMMENDED $558,336 $1,175,155 $152,934
2,885,910
kWh
$45,865
-
kW-mo/yr
$490,272
-
MMBtu
$(-130,735.0)
TOTAL IMPLEMENTED $67,800 $67,627 $38,808
732,594
kWh
$15,133
-
kW-mo/yr
$13,859
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs