Assessment Year | 1996 |
---|---|
Principal Product | Custom Injected Molded Plastics |
NAICS |
n/a
|
SIC | 3070: |
Sales Range | $5 M to 10M |
# of Employees | 80 |
Plant Area |
28,000
ft2
|
Annual Production | 3,000,000
lb
|
Production Hrs. Annual | 7,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $99,178 | 3,043,083 |
kWh
|
$0.033 |
Electricity Demand | $54,725 | 6,390 |
kW-mo/yr
|
$8.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $56,659 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,738 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $585 | $210 |
$411
12,016
kWh
|
$174
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,856 | $7,415 |
$2,675
82,649
kWh
|
$1,181
-
kW-mo/yr
|
- | |
03 | 2.3137: Use power during off-peak periods | $5,153 | - |
$5,153
153,283
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $44,499 | $178,900 |
$31,383
916,764
kWh
|
$13,116
-
kW-mo/yr
|
- | |
05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $2,566 | $680 | - | - |
$2,566
-
lb
|
|
TOTAL RECOMMENDED | $56,659 | $187,205 |
$39,622
1,164,712
kWh
|
$14,471
-
kW-mo/yr
|
$2,566
-
lb
|
||
TOTAL IMPLEMENTED | $5,738 | $210 |
$5,564
165,299
kWh
|
$174
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs