ITAC Assessment: NC0076
ITAC logo
ITAC Assessment: NC0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Custom Injected Molded Plastics
NAICS
n/a
SIC 3070:
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 28,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 7,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,178 3,043,083
kWh
Electricity Demand $54,725 6,390
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,659 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,738

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $585 $210 $411
12,016
kWh
$174
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,856 $7,415 $2,675
82,649
kWh
$1,181
-
kW-mo/yr
-
03 2.3137: Use power during off-peak periods $5,153 - $5,153
153,283
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $44,499 $178,900 $31,383
916,764
kWh
$13,116
-
kW-mo/yr
-
05 3.5315: Lease / purchase baler; sell cardboard to recycler $2,566 $680 - - $2,566
-
lb
TOTAL RECOMMENDED $56,659 $187,205 $39,622
1,164,712
kWh
$14,471
-
kW-mo/yr
$2,566
-
lb
TOTAL IMPLEMENTED $5,738 $210 $5,564
165,299
kWh
$174
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs