ITAC Assessment: UU0265
ITAC logo
ITAC Assessment: UU0265
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product NA
NAICS 611310: Colleges, Universities, and Professional Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range less than $500
k
# of Employees 100
Plant Area 76,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,188
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,337 759,371
kWh
Electricity Demand $74,759 4,820
kW-mo/yr
Natural Gas $128,353 26,574
MMBtu
Waste Disposal Costs
Water Usage $24,021 28,399
Tgal
TOTAL YEARLY COSTS $254,470
RECOMMENDED SAVINGS* $20,252 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7311: Ventilation system to shut off when room is not in use $10,697 $45,926 $5,245
147,161
kWh
$5,452
-
kW-mo/yr
- -
02 2.7243: Improve air circulation with destratification fans / other methods $2,450 $9,720 - - $2,450
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $1,938 $15,980 $1,661
46,653
kWh
$277
-
kW-mo/yr
- -
04 2.3141: Use battery storage for demand control $1,620 $14,000 - $1,620
-
kW-mo/yr
- -
05 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $1,338 $5,515 $33
929
kWh
$141
-
kW-mo/yr
- $1,164
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,000 $5,450 $627
17,540
kWh
$372
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $546 $1,620 $339
9,470
kWh
$207
-
kW-mo/yr
- -
08 2.2437: Recover waste heat from equipment $545 $572 $126
3,555
kWh
$419
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $119 $551 $19
527
kWh
$101
-
kW-mo/yr
- -
TOTAL RECOMMENDED $20,252 $99,334 $8,050
225,835
kWh
$8,588
-
kW-mo/yr
$2,450
-
MMBtu
$1,164
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs