ITAC Assessment: UU0244
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product NA
NAICS 621111: Offices of Physicians (except Mental Health Specialists)
SIC 8011: Offices and Clinics of Doctors of Medicine
Sales Range less than $500
k
# of Employees 120
Plant Area 70,000
ft2
Annual Production 1
units
Production Hrs. Annual 3,640
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,500 1,146,480
kWh
Electricity Demand $30,920 2,502
kW-mo/yr
Electricity Fees $24,290 -
Natural Gas $34,435 3,041
MMBtu
TOTAL YEARLY COSTS $131,145
RECOMMENDED SAVINGS* $8,208 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $3,850 $2,400 $3,850
106,260
kWh
-
02 2.6241: Reduce temperature of process equipment when on standby $3,681 $3,450 - $3,681
-
MMBtu
03 2.4145: Install isolation transformer on adjustable frequency drive $370 $264 $370
10,210
kWh
-
04 2.7221: Lower temperature during the winter season and vice-versa $307 $460 $307
8,476
kWh
-
TOTAL RECOMMENDED $8,208 $6,574 $4,527
124,946
kWh
$3,681
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs